When to use this Flag?
Leverage this flag to get an understanding of all the build issues that do not have effort estimation.
Type:
Process
Category:
Effort
Tools:
Atlassian Jira
Intent:
The intent of this flag is to connect to Jira, unearth all the build issues that are being executed or planned for execution which don't have effort estimation; effort estimation is important to arrive at the velocity of the team.
Configuration:
The configuration allows the Engineering manager/lead to define the scope of computation which includes the following parameters:
- Should this include build issues in just active sprint or just planning sprint or both?
- If it includes build issues in the planning sprint then how much further in time should the platform consider to analyze planning sprints.
- If it includes build issues in the active sprint then, at what point in time in the active sprint should this flag be surfaced.