When to use this Flag?

Leverage this flag to get an understanding of all members who are overloaded either based on effort estimates or number of assigned issues.


Type:

Process

Category:

Effort

Tools:

Atlassian Jira

Intent:

The intent of this flag is to connect to Jira, unearth all members in a sprint who are overloaded either based on computed effort estimates or based on number of issues assigned to a member. This flag will help the Engineering lead/manager to a better view on members who are overloaded (based on data extracted from all the sprints currently active in the connected projects/epics in the Jira configuration).  


Configuration:

The configuration allows the Engineering manager/lead to define the scope of computation which includes the following parameters:

  1. Should the calculation happen based on estimates or allocation? Note: the estimation based assessment is based on the capacity per day (from work hour settings in the workspace).
  2. If it includes build issues in the planning sprint then how much further in time should the platform consider to analyze planning sprints.


This flag uses the work time settings in Cubyts workspace to understand working days and work hours per day: