When to use this Flag?

Leverage this flag to enhance collaboration within your team by identifying all the design issues that have overlapping requirements 


Type:

Process

Category:

Effort

Tools:

Atlassian Jira, Figma

Intent:

This Nebula-powered flag intends to increase collaboration between design teams/members working on similar requirements but possibly unaware of it. By bringing for the overlaps before time designers can align on the design direction and eliminate the effort spent on building different journeys or modules for similar requirements. This ensures coherence and synergy in the product for the long term, and also reduces build effort by ensuring that the effort is spent in the design phase instead. 



Configurations:


The configuration allows the Engineering manager/lead to define the scope of computation which includes the following parameters:

  1. Should this include build issues in just active sprint or just planning sprint or both?
  2. If it includes build issues in the planning sprint then how much further in time should the platform consider to analyze planning sprints.